| Follow Us: Facebook Twitter RSS Feed

Development News

3.0 University Place will rise one block away from 40th Street Portal

A rooftop garden overlooks University City

University Place Associates (UPA), the developer behind University Place 2.0 at 30 N. 41st Street, has an even more ambitious green office building in the works. The plans for University Place 3.0 -- slated to rise at the corner of 41st and Market, just a block from the 40th Street SEPTA transit hub -- were announced in mid-October.

UPA founder Scott Mazo touts the building’s bonafides: According to UPA, it’s the world’s first commercial office building to get a platinum precertification by the U.S. Green Building Council’s LEED (Leadership in Energy and Environmental Design) program before it’s even broken ground.

On October 15, a launch ceremony for 3.0 held at 2.0 University Place featured words from Mazo, U.S. Green Building Council President Roger Platt, Councilwoman Jannie Blackwell and Pennsylvania State Senator Vince Hughes.

The five-story building, which UPA ultimately hopes will draw one to three anchor office tenants, and retail and restaurant tenants for the ground floor, will feature the latest in green technology, from fresh-air circulation and filtration systems to energy-saving glass to cutting-edge heating and cooling systems, not to mention a WIFI-enabled green roof open to all workers.

"I realize that 3.0 is not going to be for everybody," says Mazo. "But what we really want is a company that’s trying to say not just to the world but to its future tenants and employees…'We’re living it, we want to make a statement, [an] impact to the environment, and we’re making a statement with our actions.'"

3.0 will ultimately offer almost 190,000 square feet of space, and incorporate stormwater management with a modular green roof system and rooftop garden, and common area power derived from solar and wind energy. Once completed, the building will form part of what UPA hopes will be an entire "platinum corridor" of eco-friendly Market Street buildings; its exterior will feature electrochromic SageGlass.

Embedded with tiny low-voltage electrical wires, SageGlass can respond to the rays of the sun and shift its tint to block glare while preserving or deflecting the sun's heat, depending on the season. This results in significant energy savings and plenty of natural light for the people working inside, without the help of blinds or shades.

It also means that from the outside, the building will change its shade and hue throughout the day.

"I thought that was such a cool feature that will make this building stand out," enthuses Mazo, "an iconic symbol of the transformation that we’re trying to make on Market Street."

And the timeline for construction?

Hard to pinpoint right now, says Mazo. It depends on when they can secure an anchor office tenant. That could be one tenant for all four floors, or one tenant to occupy about 100,000 square feet (three floors), with one or two more tenants using the remaining space. If plans for a full-building user don’t immediately materialize, one tenant renting 100,000 square feet would be enough to move forward with the groundbreaking. Mazo estimates that construction on 3.0 could take a year to 18 months, and it’s possible they could have shovels in the dirt by April 2016.

Writer: Alaina Mabaso
Source: Scott Mazo, University Place Associates

 
Signup for Email Alerts
Signup for Email Alerts