| Follow Us: Facebook Twitter RSS Feed

Development News

U.S. Department of Transportation design event targets Vine Street

Crossing the Vine Street Expressway

Brainstorming big ideas for Vine Street

Discussing change on Vine Street

In July, a special charrette led by the U.S. Department of Transportation (USDOT) -- one of four events nationwide -- targeted the Vine Street corridor. The goal was to brainstorm ideas for improving the quality of life along Route 676 for commuters and residents alike.

On July 14 and 15, the Chinese Christian Church & Center at 11th and Vine hosted a program packed with community outreach, tours, discussions and presentations. Partners included the Deputy Managing Director’s Office of Transportation & Infrastructure Systems (OTIS; formerly the Mayor’s Office of Transportation and Utilities), the Commerce Department, PennDOT, the Delaware Valley Regional Planning Commission (DVRPC) and the Philadelphia Chinatown Development Corporation.

"This exercise has been fantastic because of all these different players in the room," enthused USDOT Chief Opportunities Officer Stephanie Jones.

Before the charrette's final public session, DVRPC Associate Director of Transportation Greg Krykewycz told Flying Kite that the event had "developed an integrated set of ideas" that made it a candidate for the DVRPC Work Program, which studies proposed infrastructure improvements as a possible step toward funding and implementation.

OTIS was responsible for bringing the needs of Vine Street to the USDOT Ladders of Opportunity Every Place Counts Design Challenge. The Washington, D.C.-based Congress for New Urbanism helps USDOT enlist city planners and designers to provide their expertise at the subsquent Ladders of Opportunity charrettes. The Philly event included walking tours, visioning and design meetings, and public forums for reacting to the preliminary designs produced. Participating architects and urban designers included Cindy Zerger and Ken Ray of Toole Design Group, and independent city planner Peter Park of Denver.

According to Park, the team’s observations included Vine Street bridge crossings that are "dangerous," "uncomfortable," and "inhospitable," fast-moving cars, and difficulty in navigating the designated crossing streets. But the "gravitas" of the neighborhood’s "historic urban fabric abounds," he added, even though it’s been "interrupted in significant ways" since the Expressway cut through Chinatown half a century ago.

USDOT's Stephanie Gidigbi shared a distilled vision from designers and participating community members after the two-day session: They hope to "re-imagine community gateways for the Vine Street Corridor that create inclusive and equitable commercial and residential neighborhood connections." More specific themes included green infrastructure, the study of vacant and underutilized space, mixed-use development potential, road diets, landscaping, new crossings and redevelopment of existing surface parking lots.

All of the concepts presented to the full house were preliminary ideas which will require further community input and study. They included a bike and pedestrian bridge to connect Vine Street to the Rail Park and Franklin Square; a "buffered bikeway" on Vine Street that would narrow the roadway and place parking between cyclists and drivers; partially capped bridges; separate bike and pedestrian space in crosswalks; stormwater planters; lighting improvements; and a traffic lane exclusively for bikes and buses.

Gidigbi urged participants to take the momentum into the neighborhood and engage residents in next steps (a report from the event will be made available online). This USDOT design challenge isn’t a finishing point, she added: The goal is to "ignite the conversation."

Writer: Alaina Mabaso
Sources: Greg Krykewycz, DVRPC; and Ladders of Opportunity leaders and designers
Signup for Email Alerts
Signup for Email Alerts